中文
英文
首页
关于我们
优膜产品
应用案例
技术服务
关注我们
新闻中心
团队建设
联系我们
Shandong Bohui Group Chemical Wastewater Zero Discharge Project
8*250m3/h ultrafiltration system
2020-11-20
Xiaoyi Coking Industrial Park Sewage Treatment Plant
8 sets of sewage treatment and ultrafiltration devices in the park, with a total of 452 membranes
2020-11-20
Junan Juxing Thermal Power Water Station
Juxing Thermal Power is a combined heat and power project. The water source used in the chemical water station is reservoir water, and the process used is UEMTECH ultrafiltration + reverse osmosis + mixed bed process. This is a typical proc
2020-11-20
共3条 当前1/1页
首页
前一页
1
后一页
尾页